The Big Creek Interceptor Aerial Sewer Project was a challenging job that required maintaining live flows through the existing aerial sewer while constructing a new sewer to replace it. This project required the bi-passing of heavy flows while renovating the downstream tunnel and connecting the new aerial sewer to the system.